On each final map shall be fully and clearly shown and identified such stakes, monuments
or other evidence determining the boundaries of the subdivision as were found on the
ground, together with sufficient corners of adjoining divisions of land, by lot and
block number, subdivision name or number and place of filing, or by section, township
and range, or other proper designation as may be necessary to locate precisely the
limits of the subdivision.
(b)
The City Engineer may require that a field survey be performed in order to establish
the boundary of any parcel map and shall examine such survey for compliance with the
Subdivision Map Act and the Land Surveyor's Act.
(Ord. No. 297, § 9.07.120.130, 3-20-2007)
var val = document.getElementById('citecontent').innerHTML;
art.dialog.defaults.title = window.location.href;
art.dialog.data('cite', val);
art.dialog.data('homeDemoPath', '/Scripts/plus/artDialog/');
art.dialog.open('/Scripts/plus/artDialog/citeiframe.html');